Changi General Hospital Medical Centre
| Construction Period | September 2014 - April 2018 |
|---|---|
| Structure / Floors | Reinforced Concrete B3-9F-PH1 |
| Total Floor Area | 64,497 sq.m. |
| Location | Singapore |
| Construction Period | September 2014 - April 2018 |
|---|---|
| Structure / Floors | Reinforced Concrete B3-9F-PH1 |
| Total Floor Area | 64,497 sq.m. |
| Location | Singapore |