Changi General Hospital Medical Centre
![](/works/images/2018/sg_hos_201804_changi_main_01.jpg)
![](/works/images/2018/sg_hos_201804_changi_main_01_thumb.jpg)
Construction Period | September 2014 - April 2018 |
---|---|
Structure / Floors | Reinforced Concrete B3-9F-PH1 |
Total Floor Area | 64,497 sq.m. |
Location | Singapore |
Construction Period | September 2014 - April 2018 |
---|---|
Structure / Floors | Reinforced Concrete B3-9F-PH1 |
Total Floor Area | 64,497 sq.m. |
Location | Singapore |