Sanai Memorial Hospital
| Construction Period | March 2018 - December 2019 |
|---|---|
| Structure / Floors | Reinforced Concrete, 9F |
| Total Floor Area | 13,561 sq.m. |
| Location | Chiba, Japan |
| Construction Period | March 2018 - December 2019 |
|---|---|
| Structure / Floors | Reinforced Concrete, 9F |
| Total Floor Area | 13,561 sq.m. |
| Location | Chiba, Japan |