TIESNA GA Factory
| Construction Period | November 2023 - September 2025 |
|---|---|
| Structure / Floors | Steel 1F |
| Total Floor Area | 19,357 sq.m. |
| Location | United States |
| Construction Period | November 2023 - September 2025 |
|---|---|
| Structure / Floors | Steel 1F |
| Total Floor Area | 19,357 sq.m. |
| Location | United States |