Tokyo Electron Taiwan Limited Tainan Operation Center
| Construction Period | December 2022 - October 2024 |
|---|---|
| Structure / Floors | Reinforced Concrete 6F-PH1 |
| Total Floor Area | 34,409 sq.m. |
| Location | Taiwan |
| Construction Period | December 2022 - October 2024 |
|---|---|
| Structure / Floors | Reinforced Concrete 6F-PH1 |
| Total Floor Area | 34,409 sq.m. |
| Location | Taiwan |