Maxim Integrated Products Factory
| Construction Period | August 2018 - June 2019 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel, 2F |
| Total Floor Area | 5,200 sq.m. |
| Location | Thailand |
| Construction Period | August 2018 - June 2019 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel, 2F |
| Total Floor Area | 5,200 sq.m. |
| Location | Thailand |