I-PEX Philippines3-Storey Building
| Construction Period | December 2022 - March 2024 |
|---|---|
| Structure / Floors | Reinforced Concrete 3F |
| Total Floor Area | 5,180 sq.m. |
| Location | Philippines |
| Construction Period | December 2022 - March 2024 |
|---|---|
| Structure / Floors | Reinforced Concrete 3F |
| Total Floor Area | 5,180 sq.m. |
| Location | Philippines |