Daihatsu Perodua Engine Manufacturing Factory
| Construction Period | September 2014 - August 2015 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel, 1F |
| Total Floor Area | 27,658 sq.m. |
| Location | Malaysia |
| Construction Period | September 2014 - August 2015 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel, 1F |
| Total Floor Area | 27,658 sq.m. |
| Location | Malaysia |