SEIREN Mexico Factory
| Construction Period | November 2014 - January 2016 |
|---|---|
| Structure / Floors | Steel, 2F |
| Total Floor Area | 24,570 sq.m. |
| Location | Mexico |
| Construction Period | November 2014 - January 2016 |
|---|---|
| Structure / Floors | Steel, 2F |
| Total Floor Area | 24,570 sq.m. |
| Location | Mexico |