Hie Shrine South Corridor
| Construction Period | April 2025 - April 2026 |
|---|---|
| Structure / Floors | Reinforced Concrete 1F |
| Total Floor Area | 87 sq.m. |
| Location | Tokyo, Japan |
| Construction Period | April 2025 - April 2026 |
|---|---|
| Structure / Floors | Reinforced Concrete 1F |
| Total Floor Area | 87 sq.m. |
| Location | Tokyo, Japan |