PARK COURT BUNKYO KOISHIKAWA THE TOWER BUNKYO GARDEN NORTH TERRACE
| Construction Period | March 2016 - July 2021 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel, B2-40F-PH2 |
| Total Floor Area | 84,315 sq.m. |
| Location | Tokyo,Japan |
| Construction Period | March 2016 - July 2021 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel, B2-40F-PH2 |
| Total Floor Area | 84,315 sq.m. |
| Location | Tokyo,Japan |