GRAN ANESIS Fujieda South
| Construction Period | October 2017 - March 2019 |
|---|---|
| Structure / Floors | Reinforced Concrete, 15F |
| Total Floor Area | 9,845 sq.m. |
| Location | Shizuoka, Japan |
| Construction Period | October 2017 - March 2019 |
|---|---|
| Structure / Floors | Reinforced Concrete, 15F |
| Total Floor Area | 9,845 sq.m. |
| Location | Shizuoka, Japan |