Hirooka Terrace
| Construction Period | June 2023 - July 2025 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel, Concrete Filled Steel Tube 13F-PH1 |
| Total Floor Area | 21,446 sq.m. |
| Location | Ishikawa, Japan |
| Construction Period | June 2023 - July 2025 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel, Concrete Filled Steel Tube 13F-PH1 |
| Total Floor Area | 21,446 sq.m. |
| Location | Ishikawa, Japan |