NGK Collaboration Square DIVERS
| Construction Period | November 2023 - April 2025 |
|---|---|
| Structure / Floors | Steel 3F |
| Total Floor Area | 4,419 sq.m. |
| Location | Aichi, Japan |
| Construction Period | November 2023 - April 2025 |
|---|---|
| Structure / Floors | Steel 3F |
| Total Floor Area | 4,419 sq.m. |
| Location | Aichi, Japan |