CREVA OKUMA・KUMA SUN TERRACE
| Construction Period | CREVA OKUMA:October 2023 - December 2024 KUMA SUN TERRACE:March 2024 - February 2025 |
|---|---|
| Structure / Floors | CREVA OKUMA:Steel 3F KUMA SUN TERRACE:Steel 1F |
| Total Floor Area | CREVA OKUMA:10,308 sq.m. KUMA SUN TERRACE:1,648 sq.m. |
| Location | Fukushima, Japan |