Kiraboshi Bank Sagamihara Center Building


Construction Period | July 2022 - January 2024 |
---|---|
Structure / Floors | Steel Reinforced Concrete, Steel B1-8F(Rooftop Unit) |
Total Floor Area | 9,267 sq.m. |
Location | Kanagawa, Japan |
Construction Period | July 2022 - January 2024 |
---|---|
Structure / Floors | Steel Reinforced Concrete, Steel B1-8F(Rooftop Unit) |
Total Floor Area | 9,267 sq.m. |
Location | Kanagawa, Japan |