MIYA MIRAI SQUARE
| Construction Period | October 2021 - March 2023 |
|---|---|
| Structure / Floors | Steel, 10F-PH1 |
| Total Floor Area | 12,726 sq.m. |
| Location | Tochigi,Japan |
| Construction Period | October 2021 - March 2023 |
|---|---|
| Structure / Floors | Steel, 10F-PH1 |
| Total Floor Area | 12,726 sq.m. |
| Location | Tochigi,Japan |