Kawakami Dam Control Building
| Construction Period | May 2020 - July 2021 |
|---|---|
| Structure / Floors | Reinforced Concrete, B1-2F-PH1 |
| Total Floor Area | 1,438 sq.m. |
| Location | Mie,Japan |
| Construction Period | May 2020 - July 2021 |
|---|---|
| Structure / Floors | Reinforced Concrete, B1-2F-PH1 |
| Total Floor Area | 1,438 sq.m. |
| Location | Mie,Japan |