HIBIYA FORT TOWER
| Construction Period | April 2018 - June 2021 |
|---|---|
| Structure / Floors | Steel Reinforced Concrete, Reinforced Concrete, Steel B2-27F-PH1 |
| Total Floor Area | 105,609 sq.m. |
| Location | Tokyo, Japan |
| Construction Period | April 2018 - June 2021 |
|---|---|
| Structure / Floors | Steel Reinforced Concrete, Reinforced Concrete, Steel B2-27F-PH1 |
| Total Floor Area | 105,609 sq.m. |
| Location | Tokyo, Japan |