MEBKS TOYOSU
| Construction Period | April 2019 - March 2021 |
|---|---|
| Structure / Floors | Steel 12F-PH1 |
| Total Floor Area | 88,186 sq.m. |
| Location | Tokyo, Japan |
| Construction Period | April 2019 - March 2021 |
|---|---|
| Structure / Floors | Steel 12F-PH1 |
| Total Floor Area | 88,186 sq.m. |
| Location | Tokyo, Japan |