Fukui Terrace
Construction Period | July 2019 - October 2020 |
---|---|
Structure / Floors | Steel, 7F-PH1 |
Total Floor Area | 4,094 sq.m. |
Location | Fukui,Japan |
Construction Period | July 2019 - October 2020 |
---|---|
Structure / Floors | Steel, 7F-PH1 |
Total Floor Area | 4,094 sq.m. |
Location | Fukui,Japan |