USUI New Head Office
| Construction Period | December 2018 - September 2020 |
|---|---|
| Structure / Floors | Steel, 5F |
| Total Floor Area | 12,916 sq.m. |
| Location | Shizuoka,Japan |
| Construction Period | December 2018 - September 2020 |
|---|---|
| Structure / Floors | Steel, 5F |
| Total Floor Area | 12,916 sq.m. |
| Location | Shizuoka,Japan |