Chiba Bank Head Office
| Construction Period | July 2018 - September 2020 |
|---|---|
| Structure / Floors | Steel 16F-PH2 |
| Total Floor Area | 46,878 sq.m. |
| Location | Chiba, Japan |
| Construction Period | July 2018 - September 2020 |
|---|---|
| Structure / Floors | Steel 16F-PH2 |
| Total Floor Area | 46,878 sq.m. |
| Location | Chiba, Japan |