Kyoto Prefectural Police New Headquarters Building
| Construction Period | March 2017 - March 2020 |
|---|---|
| Structure / Floors | Reinforced Concrete,Steel Reinforced Concrete,Steel, B2-6F |
| Total Floor Area | 27,740 sq.m. |
| Location | Kyoto,Japan |
| Construction Period | March 2017 - March 2020 |
|---|---|
| Structure / Floors | Reinforced Concrete,Steel Reinforced Concrete,Steel, B2-6F |
| Total Floor Area | 27,740 sq.m. |
| Location | Kyoto,Japan |