BIG DAISHOWA Nagoya Branch
| Construction Period | April 2019 - December 2019 |
|---|---|
| Structure / Floors | Steel, 2F |
| Total Floor Area | 1,159 sq.m. |
| Location | Aichi, Japan |
| Construction Period | April 2019 - December 2019 |
|---|---|
| Structure / Floors | Steel, 2F |
| Total Floor Area | 1,159 sq.m. |
| Location | Aichi, Japan |