TOYOSHIMA Yamaichi Building
| Construction Period | September 2017 - January 2019 |
|---|---|
| Structure / Floors | Steel, 13F |
| Total Floor Area | 10,169 sq.m. |
| Location | Aichi, Japan |
| Construction Period | September 2017 - January 2019 |
|---|---|
| Structure / Floors | Steel, 13F |
| Total Floor Area | 10,169 sq.m. |
| Location | Aichi, Japan |