The Keiyo Bank Kotehashidai Branch
 
 
 
 
 
 
| Construction Period | March 2016 - November 2017 | 
|---|---|
| Structure / Floors | Reinforced Concrete, 2F | 
| Total Floor Area | 661 sq.m. | 
| Location | Chiba, Japan | 
 
 
 
 
 
 
| Construction Period | March 2016 - November 2017 | 
|---|---|
| Structure / Floors | Reinforced Concrete, 2F | 
| Total Floor Area | 661 sq.m. | 
| Location | Chiba, Japan |