The Kyoto Shinkin Bank Seta Branch
| Construction Period | November 2016 - June 2017 |
|---|---|
| Structure / Floors | Reinforced Concrete, 2F |
| Total Floor Area | 707 sq.m. |
| Location | Shiga, Japan |
| Construction Period | November 2016 - June 2017 |
|---|---|
| Structure / Floors | Reinforced Concrete, 2F |
| Total Floor Area | 707 sq.m. |
| Location | Shiga, Japan |