Narashino City Hall
| Construction Period | October 2015 - April 2017 |
|---|---|
| Structure / Floors | Steel, Steel Reinforced Concrete, B1-6F |
| Total Floor Area | 18,164 sq.m. |
| Location | Chiba, Japan |
| Construction Period | October 2015 - April 2017 |
|---|---|
| Structure / Floors | Steel, Steel Reinforced Concrete, B1-6F |
| Total Floor Area | 18,164 sq.m. |
| Location | Chiba, Japan |