Hitachi Transport System Building
| Construction Period | July 2015 - March 2017 |
|---|---|
| Structure / Floors | Steel (CFT), B1-10F-PH1 |
| Total Floor Area | 11,724 sq.m. |
| Location | Tokyo, Japan |
| Construction Period | July 2015 - March 2017 |
|---|---|
| Structure / Floors | Steel (CFT), B1-10F-PH1 |
| Total Floor Area | 11,724 sq.m. |
| Location | Tokyo, Japan |