KKD Building
| Construction Period | June 2014 - July 2015 |
|---|---|
| Structure / Floors | Steel Reinforced Concrete (Steel), 9F |
| Total Floor Area | 1,471 sq.m. |
| Location | Tokyo, Japan |
| Construction Period | June 2014 - July 2015 |
|---|---|
| Structure / Floors | Steel Reinforced Concrete (Steel), 9F |
| Total Floor Area | 1,471 sq.m. |
| Location | Tokyo, Japan |