Nintokukai Shunan Hospital
| Construction Period | May 2023 - September 2024 |
|---|---|
| Structure / Floors | Reinforced Concrete 6F |
| Total Floor Area | 3,400 sq.m. |
| Location | Yamaguchi, Japan |
| Construction Period | May 2023 - September 2024 |
|---|---|
| Structure / Floors | Reinforced Concrete 6F |
| Total Floor Area | 3,400 sq.m. |
| Location | Yamaguchi, Japan |