Higashiosaka Hospital
Construction Period | March 2022 - July 2023 |
---|---|
Structure / Floors | Reinforced Concrete, Steel 8F-PH1 |
Total Floor Area | 12,098 sq.m. |
Location | Osaka, Japan |
Construction Period | March 2022 - July 2023 |
---|---|
Structure / Floors | Reinforced Concrete, Steel 8F-PH1 |
Total Floor Area | 12,098 sq.m. |
Location | Osaka, Japan |