Ina Hospital
| Construction Period | March 2022 - June 2023 |
|---|---|
| Structure / Floors | Reinforced Concrete 4F-PH1 |
| Total Floor Area | 11,082 sq.m. |
| Location | Saitama, Japan |
| Construction Period | March 2022 - June 2023 |
|---|---|
| Structure / Floors | Reinforced Concrete 4F-PH1 |
| Total Floor Area | 11,082 sq.m. |
| Location | Saitama, Japan |