Sanaikai General Hospital
| Construction Period | March 2021 - September 2022 |
|---|---|
| Structure / Floors | Steel, 7F-PH1 |
| Total Floor Area | 17,208 sq.m. |
| Location | Saitama,Japan |
| Construction Period | March 2021 - September 2022 |
|---|---|
| Structure / Floors | Steel, 7F-PH1 |
| Total Floor Area | 17,208 sq.m. |
| Location | Saitama,Japan |