Suizawa Hospital
| Construction Period | January 2019 - January 2020 |
|---|---|
| Structure / Floors | Reinforced Concrete, 3F |
| Total Floor Area | 3,047 sq.m. |
| Location | Mie, Japan |
| Construction Period | January 2019 - January 2020 |
|---|---|
| Structure / Floors | Reinforced Concrete, 3F |
| Total Floor Area | 3,047 sq.m. |
| Location | Mie, Japan |