Tottori Prefectural Central Hospital
| Construction Period | August 2016 - October 2018 |
|---|---|
| Structure / Floors | Steel, Steel Reinforced Concrete 11F-PH1 |
| Total Floor Area | 53,631 sq.m. |
| Location | Tottori, Japan |
| Construction Period | August 2016 - October 2018 |
|---|---|
| Structure / Floors | Steel, Steel Reinforced Concrete 11F-PH1 |
| Total Floor Area | 53,631 sq.m. |
| Location | Tottori, Japan |