Kouseikai Proton Beam Therapy Center
| Construction Period | December 2015 - September 2017 |
|---|---|
| Structure / Floors | Reinforced Concrete, B2-2F |
| Total Floor Area | 1,258 sq.m. |
| Location | Nara, Japan |
| Construction Period | December 2015 - September 2017 |
|---|---|
| Structure / Floors | Reinforced Concrete, B2-2F |
| Total Floor Area | 1,258 sq.m. |
| Location | Nara, Japan |