Cancer Support Center of the Kochi Health Sciences Center
| Construction Period | September 2015 - January 2017 |
|---|---|
| Structure / Floors | Steel Reinforced Concrete, 4F |
| Total Floor Area | 3,614 sq.m. |
| Location | Kochi, Japan |
| Construction Period | September 2015 - January 2017 |
|---|---|
| Structure / Floors | Steel Reinforced Concrete, 4F |
| Total Floor Area | 3,614 sq.m. |
| Location | Kochi, Japan |