JR Hiroshima Hospital
| Construction Period | July 2013 - October 2015 |
|---|---|
| Structure / Floors | Reinforced Concrete, 7F-PH1 |
| Total Floor Area | 22,785 sq.m. |
| Location | Hiroshima, Japan |
| Construction Period | July 2013 - October 2015 |
|---|---|
| Structure / Floors | Reinforced Concrete, 7F-PH1 |
| Total Floor Area | 22,785 sq.m. |
| Location | Hiroshima, Japan |