Japanese Red Cross Kyoto Daiichi Hospital
| Construction Period | September 2010 - September 2015 |
|---|---|
| Structure / Floors | Steel, Reinforced Concrete, B1F-5F-PH1 |
| Total Floor Area | 30,909 sq.m. |
| Location | Kyoto, Japan |
| Construction Period | September 2010 - September 2015 |
|---|---|
| Structure / Floors | Steel, Reinforced Concrete, B1F-5F-PH1 |
| Total Floor Area | 30,909 sq.m. |
| Location | Kyoto, Japan |