Icihnomiya Logistics Center II
| Construction Period | July 2022 - December 2023 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel 4F |
| Total Floor Area | 71,076 sq.m. |
| Location | Aichi, Japan |
| Construction Period | July 2022 - December 2023 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel 4F |
| Total Floor Area | 71,076 sq.m. |
| Location | Aichi, Japan |