LOGIPORT Nagoya
| Construction Period | February 2022 - July 2023 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel 4F |
| Total Floor Area | 354,744 sq.m. |
| Location | Aichi, Japan |
| Construction Period | February 2022 - July 2023 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel 4F |
| Total Floor Area | 354,744 sq.m. |
| Location | Aichi, Japan |