Prologis Park Ibaraki
| Construction Period | April 2015 - September 2016 |
|---|---|
| Structure / Floors | RCSS, 6F-PH1 |
| Total Floor Area | 189,742 sq.m. |
| Location | Osaka, Japan |
| Construction Period | April 2015 - September 2016 |
|---|---|
| Structure / Floors | RCSS, 6F-PH1 |
| Total Floor Area | 189,742 sq.m. |
| Location | Osaka, Japan |