Alps Logistics Koriyama Branch
| Construction Period | March 2015 - November 2015 |
|---|---|
| Structure / Floors | RCSS, 3F |
| Total Floor Area | 7,998 sq.m. |
| Location | Fukushima, Japan |
| Construction Period | March 2015 - November 2015 |
|---|---|
| Structure / Floors | RCSS, 3F |
| Total Floor Area | 7,998 sq.m. |
| Location | Fukushima, Japan |