Athlete Town Nobeoka Arena
| Construction Period | August 2023 - March 2026 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel, Wooden 2F |
| Total Floor Area | 12,998 sq.m. |
| Location | Miyazaki, Japan |
| Construction Period | August 2023 - March 2026 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel, Wooden 2F |
| Total Floor Area | 12,998 sq.m. |
| Location | Miyazaki, Japan |