Hakone Kowakien Yunessun Pool building
| Construction Period | September 2022 - June 2023 |
|---|---|
| Structure / Floors | Steel,Reinforced Concrete 2F |
| Total Floor Area | 744 sq.m. |
| Location | Kanagawa, Japan |
| Construction Period | September 2022 - June 2023 |
|---|---|
| Structure / Floors | Steel,Reinforced Concrete 2F |
| Total Floor Area | 744 sq.m. |
| Location | Kanagawa, Japan |