TOYOTA BOSHOKU Kariya Gym
| Construction Period | January 2019 - September 2019 |
|---|---|
| Structure / Floors | Reinforced Concrete, 1F |
| Total Floor Area | 1,494 sq.m. |
| Location | Aichi, Japan |
| Construction Period | January 2019 - September 2019 |
|---|---|
| Structure / Floors | Reinforced Concrete, 1F |
| Total Floor Area | 1,494 sq.m. |
| Location | Aichi, Japan |