ADASTRIA MITO ARENA


Construction Period | December 2016 - December 2018 |
---|---|
Structure / Floors | Reinforced Concrete, Steel, B1-3F |
Total Floor Area | 16,792 sq.m. |
Location | Ibaraki, Japan |
Construction Period | December 2016 - December 2018 |
---|---|
Structure / Floors | Reinforced Concrete, Steel, B1-3F |
Total Floor Area | 16,792 sq.m. |
Location | Ibaraki, Japan |