Fukuoka Airport Cargo Terminal
| Construction Period | January 2017 - January 2018 |
|---|---|
| Structure / Floors | Steel, 4F |
| Total Floor Area | 34,420 sq.m. |
| Location | Fukuoka, Japan |
| Construction Period | January 2017 - January 2018 |
|---|---|
| Structure / Floors | Steel, 4F |
| Total Floor Area | 34,420 sq.m. |
| Location | Fukuoka, Japan |