SHINKO Electric WIRE Factory D
| Construction Period | July 2025 - April 2026 |
|---|---|
| Structure / Floors | Steel 1F |
| Total Floor Area | 2,115 sq.m. |
| Location | Kagawa, Japan |
| Construction Period | July 2025 - April 2026 |
|---|---|
| Structure / Floors | Steel 1F |
| Total Floor Area | 2,115 sq.m. |
| Location | Kagawa, Japan |